The Rüya GES-2 project, whose construction was started in the 10th month of 2021 in Muğla Menteşe Kafaca District, was completed in the 6th month of 2022 using 1,460 solar solar panels with an installed power of 720 DC (kWp) / 600 AC (kWe).