Ruya GES-3

Ruya GES-3

Project Details

RUYA GES – 3 project, the construction of which started in the 6th month of 2022 on Muğla Menteşe Kafaca District, Muğla – Aydın Highway, was completed in the 1st month of 2023 using 2308 solar solar panels with a power of 1.050.14 DC (kWp) / 900 AC (kWe)